Wesdome Reports First Quarter 2025 Financial Results

TORONTO, May 13, 2025 (GLOBE NEWSWIRE) -- Wesdome Gold Mines Ltd. (TSX:WDO, OTCQX:WDOFF) (“Wesdome” or the “Company”) today announced its financial results for the three months ended March 31, 2025 (“Q1 2025”). Preliminary operating results for Q1 2025 were disclosed in the Company’s press release dated April 10, 2025. Management will host a conference call tomorrow, May 14, 2025 at 10:00 a.m. ET to discuss its results. All amounts are expressed in Canadian dollars unless otherwise indicated.

Highlights

  • Strong quarterly gold production and lower costs: Consolidated gold production was 45,692 ounces, a 37% increase compared to Q1 2024. Cost of sales per ounce sold decreased by 18% to US$923, while all-in sustaining costs (“AISC”) per ounce sold1 declined 17% to US$1,366. The average realized price of gold sold in Q1 2025 was US$2,882 per ounce.
  • Expanding margins: Gross profit increased by 365% year-over-year to $103.4 million and cash margin1 grew by 174% to $127.6 million.
  • Record quarterly net income: Net income increased to $62.5 million, or $0.42 earnings per share, a nearly fivefold increase from Q1 2024.
  • Record quarterly EBITDA: EBITDA1 increased by 193% to $119.4 million or tripled relative to the prior year quarter mainly due to an increase in ounces sold and a higher average realized price of gold sold.
  • Record net cash from operating activities and free cash flow1: In Q1 2025, net cash from operating activities was $80.2 million, or $0.53 per share3, while free cash flow1 was $47.5 million, or $0.32 per share.
  • Increasing liquidity: As at March 31, 2025, liquidity stood at $317.9 million, including $167.9 million in cash and $150.0 million of undrawn full capacity available under its revolving credit facility, up from $273.1 million as at December 31, 2024.
  • Announced value-driven acquisition of Angus Gold in April: The strategic addition of Angus Gold, which is expected to close by the end of June, will quadruple Eagle River’s land package. This is a highly logical and strategic tuck-in transaction that brings together a contiguous land package between the Eagle River mine and mill, enhancing the Company’s ability to unlock value through the drill bit.

Anthea Bath, President and Chief Executive Officer, commented: “The first quarter marked a strong start to the year with record revenue, net income and free cash flow, demonstrating the quality of our operating platform. As an unhedged producer, we are fully capturing the upside from higher gold prices, which has accelerated our cash generation and strengthened our debt-free balance sheet. We remain on track to meet full-year guidance, with higher production expected in the second half of the year.

“Eagle River delivered another strong quarter, benefiting from high-grade material from the 300 Zone and a drawdown of stockpiles. Results reflect greater operational execution and the successful implementation of 2024 initiatives that focused on increasing drilled and developed ore inventory, reducing dilution and cost discipline. The QA/QC phase of the global resource model initiative is progressing well in support of a 2026 technical report.

“Production at Kiena nearly doubled over the first quarter of 2024, supported by a full quarter of ore contribution from the high-grade Kiena Deep Zone, where initial stoping began in April 2024 and mining activities have ramped up steadily. Reconciliation continues to trend well to block model grades. First ore from the Presqu’île Zone is on track for Q2 and the 136-level horizon is targeting completion in early Q3 – both key to reducing grade variability and improving operational flexibility over the medium-term.

“A key pillar of Wesdome’s long-term value creation strategy continues to be exploration, focusing on extending mine life, unlocking near-mine growth and identifying new regional opportunities on our underexplored land packages. Building on our history of discovery and strong conversion rates, we are adopting a long-term, more integrated and focused approach to target generation and ranking, prioritizing high-impact zones while improving drilling efficiency through enhanced planning, contracting and execution.”

Consolidated Financial and Operating Highlights

In 000s, except per unit and per share amountsQ1 2025Q1 2024% Change
Financial results   
Revenue2187,618100,92286%
Cost of sales60,02454,29811%
Gross profit103,37422,243365%
Cash margin1127,59446,624174%
EBITDA1119,35940,675193%
Net income62,47310,708483%
Earnings per share0.420.07480%
Adjusted net income162,47310,708483%
Adjusted net income per share1 0.420.07480%
Net cash from operating activities80,15646,50272%
Operating cash flow per share3 0.530.3171%
Net cash from (used in) financing activities1,346(10,169)113%
Net cash used in investing activities(36,665)(29,452)(24%)
Free cash flow147,50519,448144%
Free cash flow per share10.320.13143%
    
Average 1 USD → CAD exchange rate1.43501.34886%
    
Operating results   
Gold produced (ounces)45,69233,32237%
Gold sold (ounces)45,30035,70027%
    
Per ounce of gold sold1   
Cost of sales4 ($/oz)1,3251,521(13%)
Cost of sales4 (US$/oz)9231,128(18%)
Cash costs1 ($/oz)1,3201,517(13%)
Cash costs1 (US$/oz)9201,125(18%)
AISC1 ($/oz)1,9602,226(12%)
AISC1 (US$/oz)1,3661,650(17%)
Average realized price1 ($/oz)4,1362,82347%
Average realized price1 (US$/oz)2,8822,09338%
    
Financial position   
Cash167,93448,252248%
Working capital5181,341(1,033)n/a
Total assets816,587636,19028%
Current liabilities57,21786,209(34%)
Total liabilities179,986194,546(7%)


Eagle River – Ontario

Eagle River, which is located 50 kilometres due west of Wawa, Ontario, consists of an underground mine (producing since 1995) and a 1,200 tonne per day mineral processing facility.

Eagle River Operating ResultsQ1 2025Q1 2024% Change
    
Ore milled (tonnes)60,010 51,632 16%
Average head grade (g/t)15.615.5 1%
Average mill recoveries (%)96.397.0 (1%)
Gold production (oz)28,99924,89916%
Gold sold (oz)27,70027,3601%
    
Production costs per tonne milled1 ($)59552613%
    
Costs per ounce of gold sold ($/oz)   
Cash margin12,8411,60677%
Cost of sales41,3321,2308%
Cash costs11,3271,2278%
All-in sustaining costs11,9181,66215%
    
Costs per ounce of gold sold (US$/oz)   
Cash margin11,9801,19066%
Cost of sales49289122%
Cash costs19259102%
All-in sustaining costs11,3371,2329%


Operating Highlights

During Q1 2025, Eagle River produced 28,999 ounces of gold as compared to 24,899 ounces in Q1 2024 primarily due to a 16% increase in throughput due to stope sequencing and dilution control. As planned, during Q1 2025, 65% of tonnes produced were from two zones: 300 and 720F.

Average head grade for Q1 2025 was in-line year-over-year at 15.6 g/t as high-grade ore from the 300 Zone was offset by processing lower grade stockpiles built up at the end of 2024.

Mill throughput of 60,010 tonnes was 16% higher than the first quarter of 2024 as prior year initiatives to increase drilled and developed inventories started to deliver results. Daily throughput rose 18% year-over-year to 667 tonnes in Q1 2025 up from 567 tonnes in Q1 2024.

Unit production costs of $595 per tonne increased by 13% over Q1 2024 due to higher labour and maintenance costs, partially offset by higher processed tonnage.

Financial Highlights

In Q1 2025, Eagle River’s revenue increased by 49% to $115.5 million from $77.5 million in Q1 2024 due to a higher average realized price of gold sold as the number of ounces was in-line year-over-year.

Cost of sales in Q1 2025 was $36.9 million, an increase of 10% compared to the comparative period in 2024 primarily due to a $4.5 million increase in mine and mill operating costs driven by higher throughput and increased royalties due to more ounces produced, partially offset by a change in inventory levels of $2.2 million.

Cash costs per ounce of gold sold were $1,327 (US$925) in Q1 2025 compared to $1,227 (US$910) in Q1 2024 due to an increase in costs of sales.

In Q1 2025, AISC per ounce of gold sold increased by 15% to $1,918 (US$1,337) as compared to Q1 2024 due to 9% higher cash costs and 17% growth in sustaining capital expenditures.

Exploration Update

Drilling Continues to Delineate 300 Zone and Expand 6 Central Zone

Drilling in the 6 Central Zone confirmed the continuation of mineralization down-plunge, demonstrating similar thickness and grade. Located near existing infrastructure, the zone remains open at depth and continues to offer the opportunity to establish another new high-grade mining front at intermediate depths. The expansion of 6 Central underscores the strong potential for further discovery, reinforcing confidence in the long-term potential of the asset and its ability to support Eagle River’s fill-the-mill organic growth strategy.

Updated interpretation of the 300 Zone indicates the presence of a sub-parallel structure, now referred to as the 300 Fold Zone. Early assays show consistent thickness and tenor of mineralization, with down-plunge continuity remaining open. Notably, this mineralization dips at a more moderate angle than the steeply dipping main 300 Zone, a key observation that highlights the variability of the plunge of the shoots, giving opportunities for down-plunge continuation of domains.

Surface Exploration

As part of the ongoing surface exploration program, an induced polarization survey was completed late in 2024 that identified multiple anomalies closely associated with known deposits, indicating the potential for additional mineralization to the west of the diorite. These findings confirm the long-term potential at Eagle River and outlined several targets for further exploration. Drilling of the first anomaly commenced before the end 2024, and drilling continued in 2025 with five holes completed to date. The program intersected minor veins and mineralization, with two of the holes returning anomalous intercepts. These results are currently being interpreted and will be discussed further in the future.

Eleven surface holes were drilled at Birch Vein as part of a phase one program, evaluating historic rock chip values associated with a splay of the northwest trending Eagle River Splay shear. Several holes intersected smoky quartz veins with strong biotite alteration up to 0.5 metre thickness. The zone is considered a high priority area due to the similar geological context to the Eagle River Mine (diorite with shearing either side), and further drilling and geochemical sampling is planned.

Kiena – Quebec

Kiena is a fully permitted, integrated mining and milling operation located on a 75 km² land package in the highly prospective Val-d’Or district of Quebec. The site features a 930-metre production shaft and a mill with a permitted capacity of 2,040 tonnes per day.

Kiena Operating ResultsQ1 2025Q1 2024% Change
    
Ore milled (tonnes)48,69045,3447%
Average head grade (g/t)10.85.983%
Average mill recoveries (%)98.998.21%
Gold production (oz)16,6938,42398%
Gold sold (oz)17,6008,340111%
    
Production costs per tonne milled1 ($)4894665%
    
Costs per ounce of gold sold ($/oz)   
Cash margin12,778323759%
Cost of sales41,3142,474(47%)
Cash costs11,3082,470(47%)
All-in sustaining costs12,0264,078(50%)
    
Costs per ounce of gold sold (US$/oz)   
Cash margin11,936240708%
Cost of sales49161,834(50%)
Cash costs19121,831(50%)
All-in sustaining costs11,4123,023(53%)


Operating Highlights

In Q1 2025, Kiena produced 16,693 ounces compared to 8,423 ounces in Q1 2024. The 98% increase in production is due to the inclusion of high-grade ore from Kiena Deep, which came into production in mid-April 2024. In Q1 2025, all of the processed ore was from the high-grade Kiena Deep Zone. While it was planned that Q1 would be the lowest production quarter of the year, there was also a delay in the sequencing of some key high-grade stoping and development areas due to lower than planned equipment availability, which is being addressed.

Average head grade in the first quarter of 2025 increased by 83% to 10.8 g/t from 5.9 g/t in the comparative quarter of 2024 despite the inclusion of some low-grade material from a recovered stope in March.

Average mill recoveries increased to 98.9% in Q1 2025 relative to 98.2% in the comparative quarter of 2024, mainly due to higher average grade.

In Q1 2025, the mill processed 541 tonnes per day, up from 498 tonnes per day in the first quarter of 2024. Associated production costs per tonne increased by 5% to $489 over Q1 2024 due to higher mining and site administration costs.

Financial Highlights

Revenue at Kiena increased by 209% to $71.9 million from $23.3 million in Q1 2024, due to a 111% increase in ounces sold and a higher average realized price per ounce of gold sold.

Cost of sales in Q1 2025 was $23.1 million, an increase of 12% over the comparative period in 2024 primarily due to a $3.3 million increase in mine operating costs, which was driven by 7% higher throughput and a 98% increase in ounces produced, partially offset by a $0.8 million change in inventory levels.

Cash costs per ounce of gold sold in Q1 2025 were $1,308 (US$912), a decrease of 47% compared to $2,470 (US$1,831) in Q1 2024 primarily due to an increase in ounces sold.

AISC per ounce of gold sold decreased by 50% in Q1 2025 to $2,026 (US$1,412) from $4,078 (US$3,023) in Q1 2024 primarily due to a 111% increase in ounces sold and decreased sustaining capital expenditures partially offset by an increase in aggregate mine operating costs.

Exploration Update

VC Zone Drilling Now Accessible from 109-Level and 134-Level Drilling Expected in Mid-2025

Drilling of the VC Zone from the new 109-level exploration drift continued during the quarter. The VC Zone is a top priority for exploration in 2025 as it historically returned a high-grade intercept at the base of the mineralisation wireframe, open at depth, and demonstrates a mineralization style analogous to Kiena Deep. Drilling to date has not been successful due to ground conditions between the drilling bay and the VC Zone. Options are being reviewed to extend underground development to a more optimal location, which is expected to enable more effective drilling of both the VC Zone and nearby North Zone targets.

Drilling at Kiena’s second drill bay – the 134-level exploration drift – is scheduled to commence in late May. This represents a significant milestone as drill holes collared from the drift will cut the Kiena Deep and Footwall mineralization at a more optimal intersection angle, improving true width estimates and providing stronger geostatistical support for grade continuity and resource modeling. Infill and extension drilling from the 134-level platform will also facilitate targeting high-grade production replacement from 2027 onwards. Drilling from the 134-level drift is a top priority for H2 2025.

Kiena Deep Continues to Deliver

The ongoing exploration of the Kiena Deep Footwall zones from the 127-level ramp, along with continued testing of the Kiena Deep A Zones through infill drilling from the 127-level remuck, continues to confirm the continuity of the zone with promising results. Initial interpretations suggest that additional lenses may be delineated with further drilling. The drill information is being incorporated into an updated lithostructural model and an updated mineral resource, both of which will form the basis for the 2026 technical report.

33-Level Accessible for Drilling, Delineation of Presqu'île to Start

Rehabilitation of the 33-level development to the east has allowed the establishment of more optimal drilling platforms for the testing of Dubuisson, Duchesne and other 33-level targets. Exploration drilling on level 33 in the first quarter targeted the lateral extensions and down-plunge continuation of the No.22 Shawkey Zone. Holes confirmed the continuity of the porphyry dyke associated to this zone with further drilling planned for 2025.

At Presqu'île, ramp development continues to advance and access to the Presqu’île orebody is well established. Exploration and delineation drilling programs have been designed and surface drilling planned for Q2 2025. Underground delineation drilling commenced in early Q2 2025. In addition to delineation of the orebody ahead of mining, exploration drilling will test extensions of the orebody as it remains open down-plunge.

Presqu’île Project Update

First mine production from the Presqu’île orebody is expected in Q2 2025, which will allow for stockpiling prior to processing in H2 2025. The bulk sample permit has been received and the mining permit is expected in the fourth quarter. Infrastructure long-lead items have also been secured with crusher installation planned for Q3 and main fan installation in 2026.

Conference Call and Webcast

Management will host a conference call and webcast to discuss the Company’s first quarter financial and operating results. A question-and-answer session will follow management’s prepared remarks. Details of the webcast are as follows:

Date and time:Wednesday, May 14, 2025 at 10:00 a.m. ET
  
Dial-in numbers:To access the call by telephone, dial 1.646.968.2525 or 1.888.596.4144 (toll-free). The event passcode is: 8215935. Please allow up to 10 minutes to be connected.
  
Webcast link:https://events.q4inc.com/attendee/291203613
 Pre-registration is required for this event. It is recommended you join 10 minutes prior to the start of the event. The webcast can also be accessed from the home page of the Company’s website at www.wesdome.com.
  

The financial statements and management’s discussion and analysis will be available on the Company’s website at www.wesdome.com and on SEDAR+ www.sedarplus.ca the evening of Tuesday, May 13, 2025.

About Wesdome

Wesdome is a Canadian-focused gold producer with two high-grade underground assets – the Eagle River mine in Ontario and the Kiena mine in Quebec. The Company’s primary goal is to responsibly leverage its operating platform and high-quality brownfield and greenfield exploration pipeline to build a growing value-driven Canadian gold producer.

Raj Gill
SVP, Corporate Development & Investor Relations
Phone: +1.416.360.3743
E-Mail: invest@wesdome.com
Trish Moran
VP, Investor Relations
Phone: +1.416.564.4290
E-mail: trish.moran@wesdome.com
  

Responsibility for Technical Information

The technical and scientific information relating to exploration activities disclosed in this document was prepared under the supervision of and verified and reviewed by Guy Belleau, P. Eng, Chief Operating Officer of the Company, a "Qualified Person" as defined in National Instrument 43-101 - Standards of Disclosure for Mineral Projects.

Forward-Looking Statements

This news release contains “forward-looking information” which involve a number of risks and uncertainties. Often, but not always, forward-looking statements can be identified by the use of words such as “plans”, “expects”, “is expected”, “budget”, “scheduled”, “estimates”, “forecasts”, “intends”, “anticipates”, or “believes” or variations (including negative variations) of such words and phrases, or state that certain actions, events or results “may”, “could”, “would”, “might” or “will” be taken, occur or be achieved. Forward-looking statements involve known and unknown risks, uncertainties and other factors which may cause the actual results, performance or achievements of the Company to be materially different from any future results, performance or achievements expressed or implied by the forward-looking statements. Forward-looking statements contained herein are made as of the date of this press release and the Company disclaims any obligation to update any forward-looking statements, whether as a result of new information, future events or results or otherwise. There can be no assurance that forward-looking statements will prove to be accurate, as actual results and future events could differ materially from those anticipated in such statements.

Forward-looking statements or information contained in this press release include, but are not limited to, statements or information with respect to: the Company’s stronger expected production in the second half of 2025; the Company’s position to deliver on its full-year guidance; the timing of the release of a Technical Report for Eagle River; the expected reduction in grade variability and improvement in operational flexibility at Kiena; the details, components and approaches as part of the Company’s long-term value creation strategy; the exploration and drilling prospects and future discovery potential of the 6 Central Zone at Eagle River; the exploration and drilling prospects of the 300 Zone at Eagle River; the potential for additional mineralization to the west of the diorite at Eagle River; exploration and drilling prospects of the VC Zone at Kiena; options to extend underground development at the VC Zone and North Zone targets at Kiena; the expected commencement of drilling at Kiena’s second drill bay; the drilling and exploration prospects of the Kiena Deep Footwall zones and the potential for additional lenses to be delineated; the planned drilling from the 33-level development at Kiena; the planned surface drilling of the Presqu’île orebody; the components and objectives of the exploration drilling of the Presqu’île orebody; the timing of the expected first mine production from the Presqu’île orebody; the expected timing of the issuance of mining permits for the Presqu’île orebody; and the expected timing of the crusher installation and main fan installation at Presqu’île. Forward-looking statements and forward-looking information by their nature are based on assumptions and involve known and unknown risks, uncertainties and other factors, which may cause the actual results, performance or achievements of the Company to be materially different from any future results, performance or achievements expressed or implied by such forward-looking statements or information.

Furthermore, should one or more of the risks, uncertainties or other factors materialize, or should underlying assumptions prove incorrect, actual results may vary materially from those described in forward-looking statements or information. These risks, uncertainties and other factors including those risk factors discussed in the sections titled “Cautionary Note Regarding Forward-Looking Information” and “Risks and Uncertainties” in the Company’s most recent Annual Information Form. Readers are urged to carefully review the detailed risk discussion in our most recent Annual Information Form which is available on SEDAR+ and on the Company’s website.

There can be no assurance that forward-looking statements or information will prove to be accurate, as actual results and future events could differ materially from those anticipated in such statements. The Company undertakes no obligation to update forward-looking statements if circumstances, management’s estimates or opinions should change, except as required by securities legislation. Accordingly, the reader is cautioned not to place undue reliance on forward-looking statements.

Non-IFRS Performance Measures

Wesdome uses non-IFRS performance measures throughout this news release as it believes that these generally accepted industry performance measures provide a useful indication of the Company’s operational performance. These non-IFRS performance measures do not have standardized meanings defined by IFRS and may not be comparable to information in other gold producers’ reports and filings. Accordingly, it is intended to provide additional information and should not be considered in isolation or as a substitute for measures of performance prepared in accordance with IFRS. The non-IFRS performance measures include:

  • Average realized price per ounce of gold sold
  • Cash costs and cash costs per ounce of gold sold
  • Production costs and production costs per tonne milled
  • Cash margin and cash margin per ounce of gold sold
  • Sustaining capital and growth capital
  • AISC and AISC per ounce of gold sold
  • Free cash flow and free cash flow per share
  • Adjusted net income (loss) and adjusted net income (loss) per share
  • EBITDA

Average Realized Price per Ounce of Gold Sold

Average realized price per ounce of gold sold is a non-IFRS measure and does not constitute a measure recognized by IFRS and does not have a standardized meaning defined by IFRS. Average realized price per ounce of gold sold is calculated by dividing gold revenue from the Company’s mining operations for the relevant period by the ounces of gold sold. It may not be comparable to information in other gold producers’ reports and filings.

In 000s, except per unit amountsQ1
2025
Q4
2024
Q3
2024
Q2
2024
Q1
2024
Q4
2023
Q3
2023
Q2
2023
         
Revenue per financial statements187,618 182,611 146,852 127,799 100,922 102,221 69,696 84,555 
Silver revenue from mining operations(243)(191)(153)(126)(134)(73)(77)(70)
Gold revenue from mining operations (a)187,375 182,420 146,699 127,673 100,788 102,148 69,619 84,485 
         
Ounces of gold sold (b)45,300 48,700 42,900 40,000 35,700 37,620 27,000 32,000 
Average realized price per ounce of gold sold
CAD (c) = (a) ÷ (b)
4,136 3,746 3,420 3,192 2,823 2,715 2,579 2,640 
Average 1 USD → CAD exchange rate (d)1.4350 1.3990 1.3637 1.3684 1.3488 1.3619 1.3414 1.3428 
Average realized price per ounce of gold sold
USD (c) ÷ (d)
2,882 2,678 2,508 2,333 2,093 1,994 1,923 1,966 
         


Cash Costs and Cash Costs per Ounce of Gold Sold

Cash costs per ounce of gold sold is a non-IFRS performance measure and does not constitute a measure recognized by IFRS and does not have a standardized meaning defined by IFRS, as well it may not be comparable to information in other gold producers’ reports and filings. The Company has included this non-IFRS performance measure throughout this document as it believes that this generally accepted industry performance measure provides a useful indication of the Company’s operational performance. The Company believes that, in addition to conventional measures prepared in accordance with IFRS, certain investors use this information to evaluate the Company’s operating performance and ability to generate cash flow. Accordingly, it is intended to provide additional information and should not be considered in isolation or as a substitute for measures of performance prepared in accordance with IFRS. The following table provides a reconciliation of total cash costs per ounce of gold sold to cost of sales per the financial statements for each of the last eight quarters:

000s, except per unit amountsQ1
2025
Q4
2024
Q3
2024
Q2
2024
Q1
2024
Q4
2023
Q3
2023
Q2
2023
         
Cost of sales per financial statements (a)60,024 57,974 52,217 51,560 54,298 54,645 47,463 55,833 
Silver revenue from mining operations(243)(191)(153)(126)(134)(73)(77)(70)
Cash costs (b)59,781 57,783 52,064 51,434 54,164 54,572 47,386 55,763 
         
Ounces of gold sold (c)45,300 48,700 42,900 40,000 35,700 37,620 27,000 32,000 
Cost of sales per ounce of gold sold (d) = (a) ÷ (c)1,325 1,190 1,217 1,289 1,521 1,453 1,758 1,745 
Cash costs per ounce of gold sold (e) = (b) ÷ (c)1,320 1,187 1,214 1,286 1,517 1,451 1,755 1,743 
Average 1 USD → CAD exchange rate (f)1.4350 1.3990 1.3637 1.3684 1.3488 1.3619 1.3414 1.3428 
Cost of sales per ounce of gold sold USD (d) ÷ (f)923 851 893 942 1,128 1,067 1,311 1,299 
Cash costs per ounce of gold sold USD (e) ÷ (f)920 848 890 940 1,125 1,065 1,308 1,298 
         


Production Costs and Production Costs per Tonne Milled

Production costs per tonne milled is a non-IFRS performance measure and does not constitute a measure recognized by IFRS and does not have a standardized meaning defined by IFRS, and as well it may not be comparable to information in other gold producers’ reports and filings. As illustrated in the table below, this measure is calculated by adjusting cost of sales, as shown in the statements of income for non-cash depletion and depreciation, royalties and inventory level changes and then dividing by tonnes processed through the mill. Management believes that production costs per tonne milled provides additional information regarding the performance of mining and milling operations and allows management to monitor operating costs on a more consistent basis as the per tonne milled measure reduces the cost variability associated with varying production levels. Management also uses this measure to determine the economic viability of mining blocks. As each mining block is evaluated based on the net realizable value of each tonne milled, the estimated revenue on a per tonne basis must be in excess of the production costs per tonne milled in order to be economically viable. Management is aware that this per tonne milled measure is impacted by fluctuations in throughput and thus uses this evaluation tool in conjunction with cost of sales prepared in accordance with IFRS. This measure supplements cost of sales information prepared in accordance with IFRS and allows investors to distinguish between changes in cost of sales resulting from changes in production versus changes in operating performance.

In 000s, except per unit amountsQ1
2025
Q4
2024
Q3
2024
Q2
2024
Q1
2024
Q4
2023
Q3
2023
Q2
2023
         
Cost of sales per financial statements (a)60,024 57,974 52,217 51,560 54,298 54,645 47,463 55,833 
Royalties(2,330)(1,927)(1,570)(1,200)(1,342)(1,266)(1,029)(1,172)
Bullion & in-circuit inventory adjustments1,837 (897)2,819 3,471 (2,267)(3,908)384 (2,526)
Production costs (b)59,531 55,150 53,466 53,831 50,689 49,471 46,818 52,135 
         
Ore milled (tonnes) (c)108,700 122,779 109,305 110,221 96,976 104,318 102,504 116,496 
Cost of sales per tonne milled (a) ÷ (c)552 472 478 468 560 524 463 479 
Production costs per tonne milled (b) ÷ (c)548 449 489 488 523 474 457 448 
         


Cash Margin and Cash Margin per Ounce of Gold Sold

Cash margin is a non-IFRS measure and does not constitute a measure recognized by IFRS and does not have a standardized meaning defined by IFRS, and as well it may not be comparable to information in other gold producers’ reports and filings. It is calculated as the difference between gold revenue from mining operations and cash mine site operating costs (see cash costs per ounce of gold sold section above) per the Company’s financial statements. The Company believes cash margin illustrates the performance of the Company’s operating mines and enables investors to better understand the Company’s performance in comparison to other gold producers who present results on a similar basis.

In 000s, except per unit amountsQ1
2025
Q4
2024
Q3
2024
Q2
2024
Q1
2024
Q4
2023
Q3
2023
Q2
2023
         
Gold revenue from mining operations187,375182,420146,699127,673100,788102,14869,61984,485
Cash costs59,78157,78352,06451,43454,16454,57247,38655,763
Cash margin127,594124,63794,63576,23946,62447,57622,23328,722
         
Per ounce of gold sold (C$)        
Average realized price (a)4,1363,7463,4203,1922,8232,7152,5792,640
Cash costs (b)1,3201,1871,2141,2861,5171,4511,7551,743
Cash margin (a) – (b)2,8162,5592,2061,9061,3061,264824897
         


Sustaining Capital and Growth Capital

Sustaining capital expenditures are generally defined as expenditures that support the ongoing operation of the asset or business without any associated increase in capacity, life of assets or future earnings. This measure is being used by management to understand the ongoing capital cost required to maintain operations at current levels.

Growth capital expenditures are generally defined as capital expenditures that expand existing capacity, increase life of assets and/or increase future earnings. This measure is used by management to understand the costs of developing new operations or major projects at existing operations where these projects will materially increase production from current levels.

In 000s, except per unit amountsQ1
2025
Q4
2024
Q3
2024
Q2
2024
Q1
2024
Q4
2023
Q3
2023
Q2
2023
         
Mining Properties, Plant and Equipment        
Eagle River        
Capitalized exploration costs1,7941,7071,2551,7221,9291,1371,2791,434
Sustaining mine development costs5,7745,5645,3585,6735,1764,5284,9514,756
Mining equipment and infrastructure upgrades5,0349,1954,2923,5491,7346,77910,3601,598
Tailings management facility1253,6514,0271901843421512
 12,72720,11714,93211,1349,02312,78616,6057,800
Kiena        
Capitalized exploration costs2,3644,1395,3411,4471,1361,347985937
Sustaining mine development costs4,9931,9741,4636,6507,7023,1772,4681,897
Mining equipment and infrastructure upgrades1,3692,4551,7211,7012,542---
Tailings management facility575-2202171---
 9,3018,5688,7459,81911,4514,5243,4532,834
Total sustaining capital22,02828,68523,67720,95320,47417,31020,05810,634
         
Mines under development, plant, and equipment        
Capitalized mine development costs7,3374,6795,8453,909988---
Ramp development – Kiena Deep-28-4363,2144,1544,1114,316
Mining equipment and infrastructure upgrades2,9502,520-2,5941,4697,1327,4852,898
Total growth capital10,2877,2275,8456,9395,67111,28611,5967,214
         
Total sustaining and growth capital32,31535,91229,52227,89226,14528,59631,65417,848
         


AISC and AISC per Ounce of Gold Sold

AISC includes mine site operating costs incurred at the Company’s mining operations, sustaining mine capital and development expenditures, mine site exploration and evaluation expenditures and equipment lease payments related to the mine operations and corporate and general expenses. The Company believes that this measure represents the total cash costs of producing gold from current operations and provides the Company and other stakeholders with additional information that illustrates its operational performance and ability to generate cash flow. This cost measure seeks to reflect the total cost of gold production from current operations on a per ounce of gold sold basis. New project and growth capital are not included.

In 000s, except per unit amountsQ1
2025
Q4
2024
Q3
2024
Q2
2024
Q1
2024
Q4
2023
Q3
2023
Q2
2023
         
Cost of sales60,024 57,974 52,217 51,560 54,298 54,645 47,463 55,833 
Silver revenue from mining operations(243)(191)(153)(126)(134)(73)(77)(70)
Cash costs59,781 57,783 52,064 51,434 54,164 54,572 47,386 55,763 
Sustaining mine exploration and development14,925 13,384 13,419 15,492 15,942 10,190 9,683 9,024 
Sustaining mine capital equipment6,403 11,655 6,012 5,250 4,275 6,779 10,360 1,598 
Tailings management facility700 3,646 4,247 210 256 342 15 12 
Corporate and general6,717 6,504 6,346 5,972 3,969 5,955 4,707 4,007 
Less: Corporate development(71)(76)(320)(14)(50)(276)(161)(210)
Payment of lease liabilities336 625 615 754 909 780 1,208 1,410 
AISC (a)88,791 93,521 82,383 79,098 79,465 78,342 73,198 71,604 
         
Ounces of gold sold (b)45,300 48,700 42,900 40,000 35,700 37,620 27,000 32,000 
AISC per ounce of gold sold (c) = (a) ÷ (b)1,960 1,920 1,920 1,977 2,226 2,082 2,711 2,238 
Average 1 USD → CAD exchange rate (d)1.4350 1.3990 1.3637 1.3684 1.3488 1.3619 1.3414 1.3428 
AISC per ounce of gold sold USD (c) ÷ (d)1,366 1,373 1,408 1,445 1,650 1,529 2,021 1,666 
         


Free Cash Flow and Free Cash Flow per Share

Free cash flow is a non-IFRS measure and is calculated by taking net cash provided by operating activities less cash used in capital expenditures and lease payments as reported in the Company’s financial statements. Free cash flow is a useful indicator of the Company’s ability to operate without reliance on additional borrowing or usage of existing cash. Free cash flow per share is calculated by dividing free cash flow by the weighted average number of shares outstanding for the period.

In 000s, except per share amountsQ1
2025
Q4
2024
Q3
2024
Q2
2024
Q1
2024
Q4
2023
Q3
2023
Q2
2023
         
Net cash from operating activities (a)80,156 76,411 60,976 57,083 46,502 37,176 45,076 13,979 
Sustaining mine exploration and development(14,925)(13,384)(13,419)(15,492)(15,942)(10,190)(9,683)(9,024)
Sustaining mine capital equipment(6,403)(11,655)(6,012)(5,250)(4,275)(6,779)(10,360)(1,598)
Tailings management facility(700)(3,646)(4,247)(210)(256)(342)(15)(12)
Growth mine exploration and development(7,337)(4,707)(5,845)(4,344)(4,203)(4,154)(4,111)(4,316)
Growth mine capital equipment(2,950)(2,520)- (2,596)(1,469)(7,132)(7,485)(2,898)
Funds held against standby letters of credit- - - - - - (1,542)- 
Payment of lease liabilities(336)(625)(615)(754)(909)(780)(1,208)(1,410)
Free cash flow (b)47,505 39,874 30,838 28,437 19,448 7,799 10,672 (5,279)
         
Weighted average number of shares (000s) (c)149,906 149,878 149,729 149,548 149,068 148,965 148,952 148,001 
         
Per share data        
Operating cash flow (a) ÷ (c)0.53 0.51 0.41 0.38 0.31 0.25 0.30 0.09 
Free cash flow (b) ÷ (c)0.32 0.27 0.21 0.19 0.13 0.05 0.07 (0.04)
         


Adjusted Net Income (Loss) and Adjusted Net Earnings (Loss) per Share

Adjusted net income (loss) and adjusted net earnings (loss) per share are non-IFRS performance measures and do not constitute a measure recognized by IFRS and do not have standardized meanings defined by IFRS, and as well both measures may not be comparable to information in other gold producers’ reports and filings. Adjusted net income (loss) is calculated by removing the one-time gains and losses resulting from the disposition of non-core assets, non-recurring expenses and significant tax adjustments (mining tax recognition and exploration credit refunds) not related to the current period’s income, as detailed in the table below. The Company discloses this measure, which is based on its financial statements, to assist in the understanding of the Company’s operating results and financial position.

In 000s, except per share amountsQ1
2025
Q4
2024
Q3
2024
Q2
2024
Q1
2024
Q4
2023
Q3
2023
Q2
2023
         
Net income (loss) per financial statements62,47356,62938,999 29,13510,7082,420(3,248)(5,014)
Adjustments for:        
Impairment of investment in associate--- ---900 - 
Retirement costs--262 ---- - 
Total adjustments--262 ---900 - 
Related income tax effect--(66)---(225)- 
 --197 ---675 - 
Adjusted net income (loss) (a)62,47356,62939,196 29,13510,7082,420(2,573)(5,014)
Weighted average number of shares (000s) (b)149,906149,878149,729 149,548149,068148,965148,952 148,001 
         
Per share data        
Adjusted net earnings (loss) per share (a) ÷ (b)0.420.380.26 0.190.070.02(0.02)(0.03)
         


EBITDA

Earnings before interest, taxes and depreciation and amortization (“EBITDA”) is a non-IFRS financial measure which excludes the following items from net income (loss): interest expense, mining and income tax expense (recovery) and depletion and depreciation. The Company believes that, in addition to conventional measures prepared in accordance with IFRS, the Company and certain investors use EBITDA as an indicator of Wesdome’s ability to generate liquidity from net cash from operating activities to fund working capital needs, service debt obligations and fund capital expenditures. EBITDA is intended to provide additional information to investors and analysts and do not have any standardized definition under IFRS and should not be considered in isolation or as a substitute for measures of performance prepared in accordance with IFRS. EBITDA excludes the impact of cash costs of financing activities and taxes, and the effects of changes in operating working capital balances and therefore are not necessarily indicative of operating profit or net cash from operating activities as determined under IFRS. Other producers may calculate EBITDA differently. The following table provides a reconciliation of net income in the Company’s financial statements to EBITDA:

In 000sQ1
2025
Q4
2024
Q3
2024
Q2
2024
Q1
2024
Q4
2023
Q3
2023
Q2
2023
         
Net income (loss) per financial statements62,47356,62938,99929,13510,7082,420(3,248)(5,014)
Adjustments for:        
Mining and income tax expense (recovery)32,38128,89920,70815,3584,55010,761(9,820)(2,356)
Depletion and depreciation24,22029,04824,29522,55024,38123,86123,987 28,215 
Non-recurring expenses--262---900 - 
Interest expense2852923368201,0361,2141,114 1,175 
EBITDA119,359114,86884,60067,86340,67538,25612,933 22,020 
         



Endnotes

  1. Refer to the section in this press release entitled “Non-IFRS Performance Measures” for the reconciliation of non-IFRS measurements to the financial statements.
  2. Revenue includes insignificant amounts from the sale of by-product silver.
  3. Operating cash flow per share is calculated by dividing net cash from activities by the weighted average number of shares.
  4. Costs of sales per ounce of gold sold is calculated by dividing the cost of sales by the number of ounces sold.
  5. Working capital is the sum of current assets less current liabilities on the statements of financial position.

Primary Logo

Stock Quote API & Stock News API supplied by www.cloudquote.io
Quotes delayed at least 20 minutes.
By accessing this page, you agree to the following
Privacy Policy and Terms Of Service.